2013 Volkswagen Golf Hatchback Sixth generation Engine Fastener Tightening Specifications
in your garage to make future searches easy.
Condition | Value |
---|
2.0 R 4motion with gasoline straight-4 2.0 L 252 HP engine (2009.11–2013.11) | 7.38 lbf⋅ft |
2.0 R 4motion with gasoline straight-4 2.0 L 252 HP engine (2009.11–2013.11) | 7.38 lbf⋅ft |
All other modifications | 5.9 lbf⋅ft |
Auxiliary drive belt deflection pulley | 29.5 lbf⋅ft |
2.0 GTi with gasoline straight-4 2.0 L 197 HP at 5100 RPM, 280 N⋅m at 1800 RPM engine (2009.6–2013.11) | 7.38 lbf⋅ft |
2.0 GTi with gasoline straight-4 2.0 L 197 HP at 5100 RPM, 280 N⋅m at 1800 RPM engine (2009.6–2013.11) | 7.38 lbf⋅ft |
2.0 GTi with gasoline straight-4 2.0 L 197 HP engine (2009.6–2013.11) | 7.38 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Screws must be replaced. | |
Second stage | 180° |
All other modifications | 16.96 lbf⋅ft |
First stage | Screw in new screw(s) hand-tight. |
Screws must be replaced. | |
Second stage | Screw in screw(s) until the stop. |
Third stage | 90° detach. |
Fourth stage | 22.13 lbf⋅ft |
Fifth stage | 90° |
2.0 TDI with diesel straight-4 2.0 L 138 HP at 4000 RPM, 320 N⋅m at 1750 RPM engine (2008.10–2013.5) | 33.19 lbf⋅ft |
2.0 TDI with diesel straight-4 2.0 L 138 HP at 4000 RPM, 320 N⋅m at 1750 RPM engine (2008.10–2013.5) | 33.19 lbf⋅ft |
2.0 TDI with diesel straight-4 2.0 L 138 HP at 4000 RPM, 320 N⋅m at 1750 RPM engine (2008.10–2013.5) | 33.19 lbf⋅ft |
All other modifications | 18.44 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
2.0 R 4motion with gasoline straight-4 2.0 L 252 HP engine (2009.11–2013.11) | 29.5 lbf⋅ft |
Tighten crosswise from inside to outside. | |
2.0 R 4motion with gasoline straight-4 2.0 L 252 HP engine (2009.11–2013.11) | 29.5 lbf⋅ft |
Tighten crosswise from inside to outside. | |
All other modifications | 18.44 lbf⋅ft |
Air-conditioning compressor pressure line | 16.23 lbf⋅ft |
2.0 TDI with diesel straight-4 2.0 L 138 HP at 4000 RPM, 320 N⋅m at 1750 RPM engine (2008.10–2013.5) | 18.44 lbf⋅ft |
2.0 TDI with diesel straight-4 2.0 L 138 HP at 4000 RPM, 320 N⋅m at 1750 RPM engine (2008.10–2013.5) | 18.44 lbf⋅ft |
2.0 TDI with diesel straight-4 2.0 L 138 HP at 4000 RPM, 320 N⋅m at 1750 RPM engine (2008.10–2013.5) | 18.44 lbf⋅ft |
All other modifications | 16.96 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
All Volkswagen gasoline straight-4 2.0 Liters CDLC engines | 29.5 lbf⋅ft |
Tighten crosswise from inside to outside. | |
All Volkswagen gasoline straight-4 2.0 Liters CRZA engines | 29.5 lbf⋅ft |
Tighten crosswise from inside to outside. | |
All other modifications | 33.19 lbf⋅ft |
Tighten from inside to outside. |
First stage | 5.9 lbf⋅ft |
Screws must be replaced. | |
Second stage | 180° |
All other modifications | 7.38 lbf⋅ft |
All Volkswagen diesel straight-4 2.0 Liters CBAB engines | 14.75 lbf⋅ft |
Sealing rings must be replaced. |
Nuts | 17.7 lbf⋅ft |
Sealing rings must be replaced. | |
Screws | 6.64 lbf⋅ft |
Sealing rings must be replaced. |
2.0 TDI with diesel straight-4 2.0 L 138 HP at 4000 RPM, 320 N⋅m at 1750 RPM engine (2008.10–2013.5) | 16.23 lbf⋅ft |
2.0 TDI with diesel straight-4 2.0 L 138 HP at 4000 RPM, 320 N⋅m at 1750 RPM engine (2008.10–2013.5) | 16.23 lbf⋅ft |
2.0 TDI with diesel straight-4 2.0 L 138 HP at 4000 RPM, 320 N⋅m at 1750 RPM engine (2008.10–2013.5) | 16.23 lbf⋅ft |
All other modifications | 5.9 lbf⋅ft |
All Volkswagen gasoline straight-4 2.0 Liters CBFA engines | 13.28 lbf⋅ft |
All Volkswagen gasoline straight-4 2.0 Liters CCTA engines | 13.28 lbf⋅ft |
All Volkswagen gasoline straight-4 2.0 Liters CCZA engines | 13.28 lbf⋅ft |
All other modifications | 20.65 lbf⋅ft |
First stage | 5.9 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
M8 screws | 14.75 lbf⋅ft |
Screws must be replaced. |
All Volkswagen gasoline straight-4 2.0 Liters CDLC engines | 7.38 lbf⋅ft |
All Volkswagen gasoline straight-4 2.0 Liters CRZA engines | 7.38 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Screws must be replaced. | |
Second stage | 45° |
First stage | 14.75 lbf⋅ft |
Screws must be replaced. | |
Second stage | 180° |
Central nuts | 70.07 lbf⋅ft |
Wheel | 14.75 lbf⋅ft |
Screws must be replaced. |
All other modifications | 20.65 lbf⋅ft |
First stage | 5.9 lbf⋅ft |
Screws must be replaced. | |
Second stage | 180° |
Nuts | 7.38 lbf⋅ft |
Screws | 3.69 lbf⋅ft |
Nuts | 7.38 lbf⋅ft |
Screws | 3.69 lbf⋅ft |
All other modifications | 14.75 lbf⋅ft |
Injection pump pulley | 14.75 lbf⋅ft |
Screws must be replaced. |
M6 × 25 screws | 7.38 lbf⋅ft |
M8 × 20 screws | 18.44 lbf⋅ft |
Lower nuts at the cylinder head | 22.13 lbf⋅ft |
Nuts must be replaced. Use hot screw paste. | |
Upper nuts at the cylinder head | 18.44 lbf⋅ft |
Nuts must be replaced. Use hot screw paste. |
At the turbocharger | 14.75 lbf⋅ft |
On the engine block | 29.5 lbf⋅ft |
Use new seal and screws. |
All other modifications | 5.9 lbf⋅ft |
Sealing rings must be replaced. |
All other modifications | 5.9 lbf⋅ft |
Sealing rings must be replaced. |
At the turbocharger | 22.13 lbf⋅ft |
Parts must be replaced. | |
On the engine block | 14.75 lbf⋅ft |
Parts must be replaced. |
At the turbocharger | 11.06 lbf⋅ft |
Sealing rings must be replaced. | |
On the engine block | 44.25 lbf⋅ft |
Use new seal and screws. |
At the turbocharger | 12.54 lbf⋅ft |
Use new seal and screws. |
At the turbocharger | 11.06 lbf⋅ft |
Sealing rings must be replaced. | |
Support at turbocharger | 14.75 lbf⋅ft |
Banjo screws | 44.25 lbf⋅ft |
Use new seal and screws. |
At the turbocharger | 12.54 lbf⋅ft |
Use new seal and screws. | |
Support at turbocharger | 14.75 lbf⋅ft |
Banjo screws | 29.5 lbf⋅ft |
Use new seal and screws. |
At the turbocharger | 8.85 lbf⋅ft |
Support at turbocharger | 14.75 lbf⋅ft |
Banjo screws | 44.25 lbf⋅ft |
Use new seal and screws. |
All Volkswagen gasoline straight-4 2.0 Liters CBFA engines | 6.64 lbf⋅ft |
All Volkswagen gasoline straight-4 2.0 Liters CCTA engines | 6.64 lbf⋅ft |
All Volkswagen gasoline straight-4 2.0 Liters CCZA engines | 6.64 lbf⋅ft |
All other modifications | 11.06 lbf⋅ft |
All other modifications | 17.7 lbf⋅ft |
First stage | 7.38 lbf⋅ft |
Screws must be replaced. Left-hand thread. | |
Second stage | 90° |
Fan wheel | 3.69 lbf⋅ft |
Radiator mounting | 3.69 lbf⋅ft |
First stage | 5.9 lbf⋅ft |
Tighten new screws in inside-to-outside order. | |
Second stage | 90° |
First stage | 5.9 lbf⋅ft |
Tighten new screws in inside-to-outside order. | |
Second stage | 90° |
All other modifications | 7.38 lbf⋅ft |
Tighten gradually and alternately from inside to outside. |
First stage | 29.5 lbf⋅ft |
Screws must be replaced. See figure 1. | |
Second stage | 90° |
Third stage | 90° |
First step | 5.9 lbf⋅ft |
Screws must be replaced. | |
Second step | 90° |
First stage | 22.13 lbf⋅ft |
Screws must be replaced. See figure 2. | |
Second stage | 36.88 lbf⋅ft |
Third stage | 90° |
Fourth stage | 90° |
First stage | 29.5 lbf⋅ft |
Screws must be replaced. See figure 2. | |
Second stage | 90° |
Third stage | 90° |
First stage | 5.9 lbf⋅ft |
Tighten new screws in inside-to-outside order. | |
Second stage | 90° |
All other modifications | 7.38 lbf⋅ft |
Tighten crosswise from inside to outside. |
Valve cover locking screws | 3.69 lbf⋅ft |
2.0 GTi with gasoline straight-4 2.0 L 197 HP at 5100 RPM, 280 N⋅m at 1800 RPM engine (2009.6–2013.11) | 6.64 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 33.19 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 22.13 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
Crankcase ventilation | 6.64 lbf⋅ft |
First stage | 110.63 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 88.51 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 66.38 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 7.38 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
Engine block closure screws | 22.13 lbf⋅ft |
First stage | 44.25 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
All other modifications | 7.38 lbf⋅ft |
First stage | Screw in screw(s) by hand. |
M10 and M8 screws. Tighten new screws in inside-to-outside order. |
First step | 47.94 lbf⋅ft |
M10 screws | |
Second step | 90° |
M10 screws |
First step | 14.75 lbf⋅ft |
M8 screws | |
Second step | 90° |
M8 screws |
First stage | 47.94 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 4.43 lbf⋅ft |
Tighten new screws crosswise in inside-to-outside order. |
M7 | 9.59 lbf⋅ft |
M8 | 14.75 lbf⋅ft |
Third stage | 90° |
First stage | 47.94 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 110.63 lbf⋅ft |
Use new seal and screws. | |
Second stage | 90° |
First stage | 14.75 lbf⋅ft |
Second stage | 90° |
First stage | 7.38 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
Balance shaft timing chain guide rail | 14.75 lbf⋅ft |
Balance shaft timing chain tension rail | 14.75 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Second stage | 45° |
Bearing pedestal at the cylinder head | 6.64 lbf⋅ft |
Camshaft adjuster valve | 6.64 lbf⋅ft |
Central screws | 25.81 lbf⋅ft |
Left-hand thread |
First stage | 5.9 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 14.75 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
Bottom | 25.81 lbf⋅ft |
Top | 18.44 lbf⋅ft |
Nuts | 14.75 lbf⋅ft |
Screws | 11.06 lbf⋅ft |
First stage | 36.88 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
Camshaft timing chain guide rail | 14.75 lbf⋅ft |
Camshaft timing chain slip rail | 14.75 lbf⋅ft |
All other modifications | 6.64 lbf⋅ft |
Camshaft timing chain tensioning rail | 14.75 lbf⋅ft |
First stage | 36.88 lbf⋅ft |
Screws must be replaced. | |
Second stage | 180° |
Central screws | 73.76 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Screws must be replaced. | |
Second stage | 45° |
All other modifications | 73.76 lbf⋅ft |
Chain tensioner | 6.64 lbf⋅ft |
Control drive chain tensioner | 6.64 lbf⋅ft |
Coupling drive tensioning roller | 14.75 lbf⋅ft |
Drive chain balance shaft tensioner | 62.69 lbf⋅ft |
Left-hand thread | 25.81 lbf⋅ft |
First stage | 29.5 lbf⋅ft |
Screws must be replaced. Left-hand thread. | |
Second stage | 90° |
First stage | 7.38 lbf⋅ft |
Replace screw and intermediate wheel when loosening the screw. | |
Second stage | for freedom from play |
First step | 22.13 lbf⋅ft |
Second step | 90° |
First stage | 66.38 lbf⋅ft |
The screws and sprocket wheel must be replaced. | |
Second stage | 90° |
2.0 GTi with gasoline straight-4 2.0 L 197 HP at 5100 RPM, 280 N⋅m at 1800 RPM engine (2009.6–2013.11) | 6.64 lbf⋅ft |
2.0 GTi with gasoline straight-4 2.0 L 197 HP at 5100 RPM, 280 N⋅m at 1800 RPM engine (2009.6–2013.11) | 6.64 lbf⋅ft |
2.0 GTi with gasoline straight-4 2.0 L 197 HP engine (2009.6–2013.11) | 6.64 lbf⋅ft |
All other modifications | 11.06 lbf⋅ft |
First stage | 5.9 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 14.75 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 36.88 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
Tension rail bearing screws | 14.75 lbf⋅ft |
M6 | 7.38 lbf⋅ft |
M10 | 36.88 lbf⋅ft |
Coolant pump | 6.64 lbf⋅ft |
All Volkswagen gasoline straight-4 2.0 Liters CDLC engines | 5.9 lbf⋅ft |
All Volkswagen gasoline straight-4 2.0 Liters CRZA engines | 5.9 lbf⋅ft |
All other modifications | 7.38 lbf⋅ft |
Use screw-locking compound. |
Toothed belt guard at the top | 7.38 lbf⋅ft |
Toothed belt guard center | 7.38 lbf⋅ft |
Use screw-locking compound. |
First stage | 18.44 lbf⋅ft |
Second stage | 45° |
First stage | 14.75 lbf⋅ft |
Nuts must be replaced. | |
Second stage | 45° |
Top part of control unit housing | 6.64 lbf⋅ft |
Gradually tighten screws crosswise. |
2.0 GTi with gasoline straight-4 2.0 L 197 HP at 5100 RPM, 280 N⋅m at 1800 RPM engine (2009.6–2013.11) | 11.06 lbf⋅ft |
2.0 GTi with gasoline straight-4 2.0 L 197 HP at 5100 RPM, 280 N⋅m at 1800 RPM engine (2009.6–2013.11) | 11.06 lbf⋅ft |
2.0 GTi with gasoline straight-4 2.0 L 197 HP engine (2009.6–2013.11) | 11.06 lbf⋅ft |
Locking screws | 18.44 lbf⋅ft |
Other screws | 8.11 lbf⋅ft |
All other modifications | 5.9 lbf⋅ft |
Oil drain plug | 22.13 lbf⋅ft |
Screws must be replaced. |
All other modifications | 14.75 lbf⋅ft |
Replace the O ring. |
Oil filter cover | 18.44 lbf⋅ft |
First stage | 11.06 lbf⋅ft |
Tighten alternately starting from the top left | |
Second stage | 180° |
Oil pressure sensor | 14.75 lbf⋅ft |
Sealing rings must be replaced. |
M6 screws | 6.64 lbf⋅ft |
M8 screws | 14.75 lbf⋅ft |
All Volkswagen diesel straight-4 2.0 Liters CBAB engines | 7.38 lbf⋅ft |
All Volkswagen diesel straight-4 2.0 Liters CFFB engines | 6.64 lbf⋅ft |
All Volkswagen diesel straight-4 2.0 Liters CJAA engines | 11.06 lbf⋅ft |
All other modifications | 11.06 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 5.9 lbf⋅ft |
Screws must be replaced. | |
Second stage | 45° |
First stage | 11.06 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
At the gearbox | 29.5 lbf⋅ft |
On the engine block | 11.06 lbf⋅ft |
Tighten gradually cross-wise |
At the gearbox | 29.5 lbf⋅ft |
On the engine block | 11.06 lbf⋅ft |
Gradually tighten screws crosswise. |
At the gearbox | 18.44 lbf⋅ft |
On the engine block | 11.06 lbf⋅ft |
Tighten gradually cross-wise |
All other modifications | 7.38 lbf⋅ft |
Sealing rings must be replaced. |
All other modifications | 3.69 lbf⋅ft |
All other modifications | 7.38 lbf⋅ft |
On exhaust manifold | 33.19 lbf⋅ft |
Use hot screw paste | |
On particle filter | 44.25 lbf⋅ft |
Glow plugs | 13.28 lbf⋅ft |
Knock sensor | 14.75 lbf⋅ft |
2.0 TDI with diesel straight-4 2.0 L 138 HP at 4000 RPM, 320 N⋅m at 1750 RPM engine (2008.10–2013.5) | 36.88 lbf⋅ft |
Use hot screw paste | |
2.0 TDI with diesel straight-4 2.0 L 138 HP at 4000 RPM, 320 N⋅m at 1750 RPM engine (2008.10–2013.5) | 36.88 lbf⋅ft |
Use hot screw paste | |
2.0 TDI with diesel straight-4 2.0 L 138 HP at 4000 RPM, 320 N⋅m at 1750 RPM engine (2008.10–2013.5) | 36.88 lbf⋅ft |
Use hot screw paste | |
All other modifications | 40.57 lbf⋅ft |
All Volkswagen gasoline straight-4 2.0 Liters CDLC engines | 33.19 lbf⋅ft |
All Volkswagen gasoline straight-4 2.0 Liters CRZA engines | 33.19 lbf⋅ft |
First stage | 29.5 lbf⋅ft |
Screws must be replaced. | |
Second stage | 180° |
First stage | 14.75 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 29.5 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 44.25 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 51.63 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 73.76 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
First stage | 36.88 lbf⋅ft |
Screws must be replaced. | |
Second stage | 90° |
All other modifications | 29.5 lbf⋅ft |
Nuts must be replaced. Use hot screw paste. |
At the bracket | 18.44 lbf⋅ft |
Clamps at the turbocharger | 5.16 lbf⋅ft |
Sealing rings must be replaced. |
Bottom | 22.13 lbf⋅ft |
Top | 14.75 lbf⋅ft |
All Volkswagen diesel straight-4 2.0 Liters CBAB engines | 14.75 lbf⋅ft |
All Volkswagen diesel straight-4 2.0 Liters CFFB engines | 17.7 lbf⋅ft |
Nuts must be replaced. | |
All Volkswagen diesel straight-4 2.0 Liters CJAA engines | 16.96 lbf⋅ft |
Nuts must be replaced. |
All other modifications | 18.44 lbf⋅ft |
Tighten new nuts evenly in several steps. |
All Volkswagen diesel straight-4 2.0 Liters CBAB engines | 14.75 lbf⋅ft |
All Volkswagen diesel straight-4 2.0 Liters CFFB engines | 17.7 lbf⋅ft |
All other modifications | 18.44 lbf⋅ft |
Replace the nuts and use fitting paste |
2.0 R 4motion with gasoline straight-4 2.0 L 252 HP engine (2009.11–2013.11) | 16.96 lbf⋅ft |
2.0 R 4motion with gasoline straight-4 2.0 L 252 HP engine (2009.11–2013.11) | 16.96 lbf⋅ft |
All other modifications | 18.44 lbf⋅ft |
Particle filter bracket | 18.44 lbf⋅ft |
Cap | 3.69 lbf⋅ft |
Otherwise | 7.38 lbf⋅ft |
All other modifications | 18.44 lbf⋅ft |
M10 | 29.5 lbf⋅ft |
M12 | 55.32 lbf⋅ft |
All other modifications | 55.32 lbf⋅ft |
Please be noted that all capacities listed here are approximate. Check fluid levels when adding or refilling as recommended in your 2013 Volkswagen Golf Hatchback user's manual. Keep in mind that all information here is provided “as is” without any warranty of any kind.
Before doing any DIY service please check your insurance policy and Volkswagen warranty policy for your region. In some regions DIY service may invalidate your warranty.
Table of Contents
- Air Conditioning Compressor Oil Capacity
- Air Conditioning Refrigerant Capacity
- All-wheel Drive Clutch Oil Capacity
- Brake Fluid Capacity
- Cooling Fluid Capacity
- Engine Oil Capacity
- Fluid and Lubricant Specifications
- Gearbox Oil Capacity
- Manual Transmission Oil Capacity
- Brake System Specifications
- Chassis Specifications
- Cooling System Specifications
- Drive Belts Specifications
- Electrical System Specifications
- Emission
Conquer your fears and never give up!
DIY car service is not as difficult as it looks like and it might save you thousands of dollars per year. It might be even fun and a good thing to do with your kids on a weekend to teach them how basic machinery works. It's really hard to screw something up and damage your car permanently if you use right tools, follow Volkswagen Golf Hatchback service manual and use right parts and fluids in prescribed amounts. Even modern cars stuffed with electronics can be serviced in your garage or even in your driveway. Changing engine oil, brake fluid, ATF, replacing brake pads, and etc. It's all may be done by yourself in a mater of a couple of hours.
Doing basic service for your 2013 Volkswagen Golf Hatchback you're not only saving money, but also also improving your technical skills and learning something new.
2013 Volkswagen Golf Hatchback generations
In 2013 Volkswagen offered 2 generations of the Golf Hatchback. Engine fastener tightening specifications may vary in different generations. Be sure that you are looking at the rigt modification.