2009 BMW Z4 Second generation Engine Fastener Tightening Specifications
in your garage to make future searches easy.
Condition | Value |
---|
M7 | 11.06 lbf⋅ft |
M6 | 7.38 lbf⋅ft |
M7 | 11.06 lbf⋅ft |
M8 | 16.23 lbf⋅ft |
At the bracket | 15.49 lbf⋅ft |
First stage | 7.38 lbf⋅ft |
Use new screws. | |
Second stage | 190° |
M8 | 14.01 lbf⋅ft |
M10 | 28.03 lbf⋅ft |
M7 | 8.11–11.06 lbf⋅ft |
M14 | 19.91–24.34 lbf⋅ft |
M12 | 14.75–19.18 lbf⋅ft |
M14 | 19.91–24.34 lbf⋅ft |
M12 | 14.75–19.18 lbf⋅ft |
M6 | 8.85 lbf⋅ft |
Tighten bolts uniformly in several passes. |
M14 | 36.88 lbf⋅ft |
Replace sealing rings and screws. |
Inlet camshaft | 6.64 lbf⋅ft |
Replace aluminum screws. |
First stage | 5.9 lbf⋅ft |
Replace aluminum screws. | |
Second stage | 60° |
M6 × 30 screws | 7.38 lbf⋅ft |
M6 × 50 screws | 8.85 lbf⋅ft |
First stage | 22.13 lbf⋅ft |
Replace screws. See figure 1. | |
Second stage | 90° |
Fourth stage | 45° |
Third stage | 90° |
Fifth stage | 7.38 lbf⋅ft |
Replace screws. |
Sixth stage | 90° |
Seventh stage | 135° |
First stage | 22.13 lbf⋅ft |
Replace screws. See figure 1. | |
Second stage | 90° |
Fourth stage | 45° |
Third stage | 90° |
Fifth stage | 16.23 lbf⋅ft |
Replace screws. |
First stage | 22.13 lbf⋅ft |
Replace screws. See figure 2. | |
Third stage | 90° |
Fifth stage | 180° |
Second stage | 22.13 lbf⋅ft |
Replace screws. | |
Fourth stage | 90° |
Sixth stage | 180° |
Seventh stage | 16.23 lbf⋅ft |
M7 | 6.64 lbf⋅ft |
Replace aluminum screws. |
M6 | 7.38 lbf⋅ft |
M7 | 11.06 lbf⋅ft |
All other modifications | 6.64 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Use new screw. | |
Second stage | 70.07 lbf⋅ft |
M6 × 25 screws | 7.38 lbf⋅ft |
First stage | 14.01 lbf⋅ft |
Second stage | 90° |
First stage | 14.01 lbf⋅ft |
Second stage | 90° |
First stage | 14.75 lbf⋅ft |
Replace screw, wash and slightly oil. | |
Second stage | 120° |
First stage | 14.75 lbf⋅ft |
Replace, wash and lubricate the screws. | |
Second stage | 140° |
First stage | 14.75 lbf⋅ft |
Replace screw, wash and slightly oil. | |
Second stage | 140° |
First stage | 73.76 lbf⋅ft |
Replace screws. | |
Second stage | 360° |
First stage | 73.76 lbf⋅ft |
Replace the screws and lubricate lightly | |
Second stage | 360° |
First stage | 73.76 lbf⋅ft |
Use new screw. | |
Second stage | 270° |
M8 × 16 screws | 25.81 lbf⋅ft |
Magnesium valve cover | 88.51 lbf⋅ft |
Replace screws. |
First stage | 22.13 lbf⋅ft |
Replace screws. | |
Second stage | 92.2 lbf⋅ft |
First stage | 22.13 lbf⋅ft |
Replace screws. | |
Second stage | 92.2 lbf⋅ft |
N52 engine | 88.51 lbf⋅ft |
Replace screws. |
M12 | 88.51 lbf⋅ft |
Replace screws. |
First stage | 44.25 lbf⋅ft |
Replace screws. | |
Second stage | 45° |
First stage | 14.75 lbf⋅ft |
Replace screws. | |
Second stage | 70° |
First stage | 11.06 lbf⋅ft |
Replace screws. | |
Second stage | 90° |
First stage | 11.06 lbf⋅ft |
Replace screws. | |
Second stage | 90° |
First stage | 5.9 lbf⋅ft |
Replace screws. | |
Second stage | 90° |
First stage | 14.75 lbf⋅ft |
Replace screws. | |
Second stage | 70° |
First stage | 14.75 lbf⋅ft |
Replace screws. See figure 3. | |
Second stage | 90° |
Third stage | 16.23 lbf⋅ft |
M8 × 16 screws (class 10.9) | 25.81 lbf⋅ft |
M8 × 20 screws (class 8.8) | 18.44 lbf⋅ft |
M8 × 16 screws | 25.81 lbf⋅ft |
M7 | 10.33 lbf⋅ft |
Cap | 18.44 lbf⋅ft |
M7 | 10.33 lbf⋅ft |
M8 | 14.75 lbf⋅ft |
M7 | 10.33 lbf⋅ft |
M6 × 35 screws | 5.9 lbf⋅ft |
All BMW gasoline straight-6 2.5 L N52 B25 A engines | 40.57 lbf⋅ft |
Replace sealing rings. | |
All BMW gasoline straight-6 3.0 L N52 B30 A engines | 40.57 lbf⋅ft |
Replace sealing rings. | |
All other modifications | 59 lbf⋅ft |
M8 | 14.75 lbf⋅ft |
Cap | 36.88 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Replace screws. | |
Second stage | 180° |
M22 × 1,5 screws | 40.57 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Replace screws. | |
Second stage | 180° |
First stage | 40.57 lbf⋅ft |
Second stage | 55° |
Oil pump drive chain tensioner | 7.38 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Replace screws. | |
Second stage | 180° |
First stage | 40.57 lbf⋅ft |
Second stage | 55° |
M7 | 11.06 lbf⋅ft |
M8 | 14.75 lbf⋅ft |
M12 × 1,5 screws | 18.44 lbf⋅ft |
Replace sealing rings. |
M12 | 18.44 lbf⋅ft |
Replace sealing rings. |
M12 × 1,5 screws | 5.9 lbf⋅ft |
Replace plastic screw. |
M8 | 16.23 lbf⋅ft |
Replace sealing rings. |
Oil filter cover | 18.44 lbf⋅ft |
Replace sealing rings. |
At the cylinder head | 16.23 lbf⋅ft |
Oil filter cover | 18.44 lbf⋅ft |
First stage | 7.38 lbf⋅ft |
Second stage | 180° |
First stage | 7.38 lbf⋅ft |
Second stage | 90° |
First stage | 7.38 lbf⋅ft |
Replace screws. | |
Second stage | 180° |
First stage | 7.38 lbf⋅ft |
Use new screws | |
Second stage | 90° |
M6 × 70 screws | 7.38 lbf⋅ft |
See figure 4. |
First stage | 14.75 lbf⋅ft |
Second stage | 45° |
First stage | 14.75 lbf⋅ft |
Second stage | 45° |
First stage | 14.75 lbf⋅ft |
Use new screw. | |
Second stage | 70.07 lbf⋅ft |
First stage | 5.9 lbf⋅ft |
Replace screws. | |
Second stage | 180° |
First stage | 5.9 lbf⋅ft |
Replace screws. | |
Second stage | 90° |
First stage | 5.9 lbf⋅ft |
Replace screws. | |
Second stage | 90° |
First stage | 5.9 lbf⋅ft |
Replace screws. | |
Second stage | 90° |
First stage | 5.9 lbf⋅ft |
Replace screws. | |
Second stage | 90° |
First stage | 5.9 lbf⋅ft |
Replace screws. | |
Second stage | 180° |
First stage | 5.9 lbf⋅ft |
Replace screws. | |
Second stage | 180° |
First stage | 5.9 lbf⋅ft |
Replace screws. | |
Second stage | 60° |
First stage | 5.9 lbf⋅ft |
Replace screws. | |
Second stage | 90° |
Plastic oil sump | 7.38 lbf⋅ft |
M6 | 6.64 lbf⋅ft |
M6 | 5.9 lbf⋅ft |
M6 | 2.21 lbf⋅ft |
M6 | 5.9 lbf⋅ft |
M8 | 7.38 lbf⋅ft |
M8 × 30 screws | 16.23 lbf⋅ft |
Lambda sensor | 36.88 lbf⋅ft |
M10 | 41.3 lbf⋅ft |
M8 | 20.65 lbf⋅ft |
M12 | 79.66 lbf⋅ft |
At the bracket | 20.65 lbf⋅ft |
M8 | 14.75 lbf⋅ft |
Use assembly paste |
M8 | 14.75 lbf⋅ft |
Replace nuts. |
First stage | 5.9 lbf⋅ft |
Replace nuts. See figure 5. | |
Second stage | 9.59 lbf⋅ft |
M12 | 14.75–19.18 lbf⋅ft |
M14 | 19.91–24.34 lbf⋅ft |
First stage | 14.75 lbf⋅ft |
Replace screws. | |
Second stage | 90° |
First stage | 14.75 lbf⋅ft |
Replace screws. | |
Second stage | 180° |
M10 | 28.03 lbf⋅ft |
M10 | 28.03 lbf⋅ft |
Please be noted that all capacities listed here are approximate. Check fluid levels when adding or refilling as recommended in your 2009 BMW Z4 user's manual. Keep in mind that all information here is provided “as is” without any warranty of any kind.
Before doing any DIY service please check your insurance policy and BMW warranty policy for your region. In some regions DIY service may invalidate your warranty.
Table of Contents
- Air Conditioning Compressor Oil Capacity
- Air Conditioning Refrigerant Capacity
- Automatic Transmission Fluid Capacity
- Brake Fluid Capacity
- Cooling Fluid Capacity
- Engine Oil Capacity
- Fluid and Lubricant Specifications
- Manual Transmission Oil Capacity
- Engine Fastener Tightening Specifications
- Front Suspension Fastener Tightening Specifications
- Rear Suspension Fastener Tightening Specifications
- Transmission Fastener Tightening Specifications
Conquer your fears and never give up!
DIY car service is not as difficult as it looks like and it might save you thousands of dollars per year. It might be even fun and a good thing to do with your kids on a weekend to teach them how basic machinery works. It's really hard to screw something up and damage your car permanently if you use right tools, follow BMW Z4 service manual and use right parts and fluids in prescribed amounts. Even modern cars stuffed with electronics can be serviced in your garage or even in your driveway. Changing engine oil, brake fluid, ATF, replacing brake pads, and etc. It's all may be done by yourself in a mater of a couple of hours.
Doing basic service for your 2009 BMW Z4 you're not only saving money, but also also improving your technical skills and learning something new.
2009 BMW Z4 generations
In 2009 BMW offered 2 generations of the Z4. Engine fastener tightening specifications may vary in different generations. Be sure that you are looking at the rigt modification.