in your garage to make future searches easy.

Condition Value
expand_moreAir intake system
expand_moreInduction-pipe flap control unit
At the exhaust manifold 7.388.85 lbf⋅ft
Intake manifold 14.7518.44 lbf⋅ft
Nuts must be replaced.
Intake manifold support 14.7518.44 lbf⋅ft
expand_moreAuxiliary assemblies
expand_moreAir-conditioning compressor
All other modifications 14.7522.13 lbf⋅ft
expand_moreAir-conditioning compressor bracket
All other modifications 14.7518.44 lbf⋅ft
expand_moreAir-conditioning compressor pressure line
All other modifications 4.43 lbf⋅ft
expand_moreAlternator
All other modifications 36.8847.94 lbf⋅ft
expand_moreAuxiliary drive belt deflection pulley
All other modifications 40.5747.94 lbf⋅ft
Auxiliary drive belt tensioner 40.5747.94 lbf⋅ft
expand_moreAuxiliary drive belt tensioner
All other modifications 33.1940.57 lbf⋅ft
expand_moreGenerator bracket
2.0 CVVT 4WD with gasoline straight-4 2.0 L 164 HP engine (2009.8–) 29.533.19 lbf⋅ft
expand_moreAll other modifications
Top 14.7522.13 lbf⋅ft
Bottom 33.1940.57 lbf⋅ft
Servo steering pump 14.7518.44 lbf⋅ft
expand_moreVacuum pump
All other modifications 5.98.85 lbf⋅ft
expand_moreCarburetion
expand_moreFuel-distributing pipe
All other modifications 14.7522.13 lbf⋅ft
High-pressure line 19.1823.6 lbf⋅ft
Replace fuel line.
expand_moreHigh-pressure pump
All other modifications 18.4422.13 lbf⋅ft
expand_moreHigh-pressure pump pulley
All other modifications 5966.38 lbf⋅ft
Injection hoses 17.720.65 lbf⋅ft
Injection lines must be replaced.
Injection nozzle (injector) 22.13 lbf⋅ft
expand_moreInjection pump
All other modifications 18.44 lbf⋅ft
expand_moreCharging
expand_moreTurbo charger
All other modifications 36.8851.63 lbf⋅ft
Sealing rings must be replaced.
expand_moreTurbocharger oil feed line
At the cylinder head 14.7518.44 lbf⋅ft
Sealing rings must be replaced.
At the turbocharger 7.388.85 lbf⋅ft
Seals must be replaced.
expand_moreTurbocharger oil return line
At the turbocharger 7.388.85 lbf⋅ft
Sealing rings must be replaced.
On the engine block 14.7518.44 lbf⋅ft
Sealing rings must be replaced.
expand_moreCooling system
expand_moreCoolant pump
All other modifications 14.7518.44 lbf⋅ft
Sealing rings must be replaced.
expand_moreCoolant pump pulley
All other modifications 5.97.38 lbf⋅ft
Radiator mounting 5.97.38 lbf⋅ft
expand_moreCylinder head
expand_moreCamshaft bearing
expand_more2.0 CVVT 4WD with gasoline straight-4 2.0 L 164 HP engine (2009.8–)
expand_moreM6
First stage 4.43 lbf⋅ft
Second stage 8.85 lbf⋅ft
expand_moreM8
First stage 11.06 lbf⋅ft
Second stage 22.13 lbf⋅ft
All other modifications 8.85 lbf⋅ft
expand_moreCylinder head screws
expand_moreAll other modifications
Figure 1. Cylinder head, Cylinder head screws, All other modifications.
Figure 1. Cylinder head, Cylinder head screws, All other modifications.
First stage 23.626.55 lbf⋅ft
Screws must be replaced. See figure 1.
Second stage 90°
Third stage 90°
expand_moreValve cover
All other modifications 5.97.38 lbf⋅ft
Tighten in a number of passes starting in a spiral fashion from the inside outward.
expand_moreEngine block
expand_moreConnecting rod bearing
expand_more2.0 CVVT 4WD with gasoline straight-4 2.0 L 164 HP engine (2009.8–)
First stage 14.75 lbf⋅ft
Screws must be replaced.
Second stage 90°
expand_moreAll other modifications
First stage 22.13 lbf⋅ft
Second stage 90°
expand_moreCrankshaft central screws
All other modifications 125.39132.76 lbf⋅ft
Crankshaft pulley 147.51154.89 lbf⋅ft
expand_moreDrive plate
All other modifications 88.5195.88 lbf⋅ft
Screws must be replaced. Tighten new screws crosswise.
expand_moreFlywheel
All other modifications 88.5195.88 lbf⋅ft
Screws must be replaced. Tighten new screws crosswise.
expand_moreMain bearing
expand_more2.0 CVVT 4WD with gasoline straight-4 2.0 L 164 HP engine (2009.8–)
Figure 2. Engine block, Main bearing, 2.0 CVVT 4WD with gasoline straight-4 2.0 L 164 HP engine (2009.8–).
Figure 2. Engine block, Main bearing, 2.0 CVVT 4WD with gasoline straight-4 2.0 L 164 HP engine (2009.8–).
First stage 10.33 lbf⋅ft
Screws must be replaced. See figure 2.
Second stage 22.13 lbf⋅ft
Third stage 120°
expand_moreAll other modifications
First stage 36.14 lbf⋅ft
Second stage 120°
expand_moreEngine control
Balance shaft timing chain guide rail 7.388.85 lbf⋅ft
Balance shaft timing chain tension rail 7.388.85 lbf⋅ft
Camshaft timing chain guide rail 7.388.85 lbf⋅ft
Camshaft timing chain slip rail 7.3810.33 lbf⋅ft
Camshaft timing chain tensioner 7.388.85 lbf⋅ft
expand_moreCamshaft timing chain tensioning rail
All other modifications 7.388.85 lbf⋅ft
Chain tensioner 7.388.85 lbf⋅ft
expand_moreControl drive chain guide rail
All other modifications 7.388.85 lbf⋅ft
Control drive chain tensioner 7.388.85 lbf⋅ft
Drive chain balance shaft tensioner 7.388.85 lbf⋅ft
expand_moreInlet camshaft wheel
All other modifications 40.5747.94 lbf⋅ft
expand_moreOutlet camshaft wheel
2.0 CVVT 4WD with gasoline straight-4 2.0 L 164 HP engine (2009.8–) 40.5747.94 lbf⋅ft
All other modifications 11.0614.75 lbf⋅ft
Tension rail bearing screws 14.75 lbf⋅ft
expand_moreTiming case cover
M6 7.38 lbf⋅ft
M8 14.7518.44 lbf⋅ft
M10 29.533.19 lbf⋅ft
expand_moreEngine lubrication
expand_moreOil cooler
2.0 CVVT 4WD with gasoline straight-4 2.0 L 164 HP engine (2009.8–) 33.1940.57 lbf⋅ft
Lubricate the sealing ring.
All other modifications 7.388.85 lbf⋅ft
Sealing rings must be replaced.
Oil drain plug 25.0832.45 lbf⋅ft
expand_moreOil filter
All other modifications 8.8511.8 lbf⋅ft
Lubricate the sealing ring.
expand_moreOil filter housing
Oil filter cover 23.628.03 lbf⋅ft
Oil filter drain plug 7.38 lbf⋅ft
On the engine block 14.7522.13 lbf⋅ft
Oil pressure sensor 7.388.85 lbf⋅ft
expand_moreOil pump
expand_more2.0 CVVT 4WD with gasoline straight-4 2.0 L 164 HP engine (2009.8–)
First stage 7.38 lbf⋅ft
Second stage 14.75 lbf⋅ft
All other modifications 18.44 lbf⋅ft
expand_moreOil sump
expand_moreAll other modifications
M6 7.388.85 lbf⋅ft
M9 22.1325.08 lbf⋅ft
expand_moreEngine management
expand_moreCamshaft sensor
All other modifications 5.98.85 lbf⋅ft
expand_moreCrankshaft sensor
2.0 CVVT 4WD with gasoline straight-4 2.0 L 164 HP engine (2009.8–) 7.38 lbf⋅ft
Lubricate the sealing ring.
All other modifications 4.43 lbf⋅ft
Glow plugs 11.0614.75 lbf⋅ft
Knock sensor 14.7516.23 lbf⋅ft
expand_moreLambda sensor
All other modifications 29.536.88 lbf⋅ft
expand_moreEngine mounting
expand_moreEngine bracket
2.0 CVVT 4WD with gasoline straight-4 2.0 L 164 HP engine (2009.8–) 5973.76 lbf⋅ft
All other modifications 33.1940.57 lbf⋅ft
expand_moreEngine mounting
Nuts on chassis 47.261.96 lbf⋅ft
Nuts on engine bracket 36.8847.94 lbf⋅ft
Screws on engine bracket 36.8847.94 lbf⋅ft
expand_moreSubframe
All other modifications 132.76147.51 lbf⋅ft
expand_moreTorque arm
At the gearbox 81.1395.88 lbf⋅ft
At the subframe 36.8847.94 lbf⋅ft
expand_moreExhaust system
Catalytic converter 29.544.25 lbf⋅ft
Nuts must be replaced.
expand_moreDiesel particulate filter
At the turbocharger 36.8851.63 lbf⋅ft
Sealing rings must be replaced.
expand_moreExhaust manifold
expand_more2.0 CVVT 4WD with gasoline straight-4 2.0 L 164 HP engine (2009.8–)
At the cylinder head 36.8840.57 lbf⋅ft
expand_moreStrut
M8 18.44 lbf⋅ft
M10 40.57 lbf⋅ft
All other modifications 29.533.19 lbf⋅ft
Nuts must be replaced.
Exhaust manifold heat shield(s) 7.388.85 lbf⋅ft
expand_moreExhaust pipe
All other modifications 18.4425.81 lbf⋅ft
Nuts must be replaced.
Particle filter bracket 33.1940.57 lbf⋅ft
Particulate filter heat protection plate 14.75 lbf⋅ft
expand_moreFuel supply
Fuel pump 2.214.43 lbf⋅ft
expand_moreIgnition system
expand_moreSpark plugs
All other modifications 11.0618.44 lbf⋅ft
expand_moreStart system
expand_moreStarter
All other modifications 36.8847.94 lbf⋅ft

Please be noted that all capacities listed here are approximate. Check fluid levels when adding or refilling as recommended in your 2009 Hyundai Tucson user's manual. Keep in mind that all information here is provided “as is” without any warranty of any kind.

Before doing any DIY service please check your insurance policy and Hyundai warranty policy for your region. In some regions DIY service may invalidate your warranty.

Conquer your fears and never give up!

DIY car service is not as difficult as it looks like and it might save you thousands of dollars per year. It might be even fun and a good thing to do with your kids on a weekend to teach them how basic machinery works. It's really hard to screw something up and damage your car permanently if you use right tools, follow Hyundai Tucson service manual and use right parts and fluids in prescribed amounts. Even modern cars stuffed with electronics can be serviced in your garage or even in your driveway. Changing engine oil, brake fluid, ATF, replacing brake pads, and etc. It's all may be done by yourself in a mater of a couple of hours.

Doing basic service for your 2009 Hyundai Tucson you're not only saving money, but also also improving your technical skills and learning something new.

2009 Hyundai Tucson generations

In 2009 Hyundai offered 2 generations of the Tucson. Engine fastener tightening specifications may vary in different generations. Be sure that you are looking at the rigt modification.

Hyundai Tucson Second generation model years

Units:
facebook twitter reddit linkedin messenger whatsapp telegram skype email chat